Our network

Public Hearing Scheduled for Proposed Washington Coal Plant | Community Spirit

Title (Max 100 Characters)

Public Hearing Scheduled for Proposed Washington Coal Plant

A public hearing on pollution levels for proposed Plant Washington coal-fired plant will take place on Tuesday, Dec. 7 at 6 p.m. at Ridge Road Elementary School.

Georgians for Smart Energy (GSE) will host an information session at 6 p.m.

At 7 p.m., the Georgia Environmental Protection Division (EPD) will conduct a public hearing about Plant Washington.

Proposed by Power4Georgians, LLC, the coal-fired power plant would be located near Sandersville in Central Ga.

The hearing subject is the water withdrawal permit and the water discharge permits (NPDES permit).

According to a news release, if Plant Washington is built, the water would be piped in 30 miles from the Oconee River and draw from 15 groundwater wells near the proposed plant site.

GSE is a coalition of energy, citizen and environmental organizations from across Georgia, including Washington County residents.

Ridge Road Elementary School is located at 285 Ridge Road in Sandersville.

Milledgeville Businesses